Skip to content
Letter of intent Contact
en

Infrastructure

Ready infrastructure and land

Utilities on site

  • Water network
  • Foul and storm sewerage
  • Street and perimeter lighting
  • Internal road network
  • Direct access to the internal network for each plot

Status of each utility

  • Drinking water Network connected to the Lețcani public system.
  • Foul sewerage Integrated into the public sewerage system.
  • Natural gas Available at the entrance to the park; extension of the network to each plot is a matter of connection, based on a technical design approved by the distribution operator and an in-principle approval from the administrator, with a minimal investment for the connection to the network; the design and the connection works are the resident's responsibility.
  • Electricity Network on site; a power-capacity extension is under way, the capacity available at contract signature is communicated to the investor on request.
  • Storm water drainage Separate network, discharge as per permits.
  • Telecommunications Modern infrastructure, optical fibre.
  • Internal roads Internal network designed for heavy traffic.
  • Lighting Exterior lighting across the whole site.
  • Security Video surveillance and perimeter guarding of common areas.
  • Administrative building Offices and conference room available for rent.

Services and facilities for operations

Security and lighting

Perimeter security and exterior lighting, active from the first plot allocations.

Services as the park fills up

Banking services and a medical office, as the park fills up.

Plots

Areas adaptable to the resident's request, from 3,000 to 23,000 sqm.